Month: August 2022

New Expansion Topped Out – Parkview Kosciusko

“It will be a place where hopefully they feel like their loved ones can come and receive care, and they feel like they’re safe while they’re there.”

Scott Gabriel (President, Parkview Whitley, Kosciusko Hospitals)

The Cherry on Top

DSC 0484

Celebrating the successful completion of the Parkview Kosciusko hospital addition’s frame, we put together a special, final beam. Once we had it primed and ready for signatures, it was signed by everyone who is involved in this project. After that, the tower crane lifted the last piece, where our team secured it. And with that, the construction of the expansion framework was complete!

Watch our team top off the steel right here!

For the County

DSC 0481

For Parkview leadership, this accomplishment is a testament to the community that they are serving. “Those grateful patients are always the key to what keeps us going,” says Scott Gabriel (President of Parkview Whitley and Kosciusko Hospitals). This expansion has been an ask by the Warsaw community for years. It will provide more accessibility for patients in the area to receive medical treatment. In the past, residents of Warsaw had to travel to neighboring counties for serious care. However, with the addition of this new section, that problem will remain what it was: a thing of the past.

“We opened up six years ago; the community immediately began asking, ‘When are you going to have inpatient beds; when are you going to have surgery?’ …To be able to say we’ve topped off our expansion project to include those services and more is great.”

Jeffrey Rockett (V.P. of Outpatient Services)

Just like the team at Parkview, we’re so excited to see the progress on this new section! We’re honored to join forces with them once again to meet the needs of this county.


Now Open – The Amp Lab @ Electric Works!

Fort Wayne Bryan Hospital

“We’re not just preparing students for jobs; we’re preparing them for careers that haven’t even been developed yet.”

Riley Johnson (Amp Lab Director)

A New Kind of Education

8.3.22 049

Think-tanks, group projects, and cooperation are in the works at the new FWCS Amp Lab! Built as part of the Electric Works expansion/renovation project, Weigand operated as the construction manager, making sure that every section went up as planned and on time. The Amp Lab is a special school program that is available for up to four hundred juniors and seniors that attend any of the five FWCS high schools.

With the goal to prepare students for an ever-changing workplace, it functions as a space where students can focus their passion and creativity. By tapping into what inspires them, these members of the future working world can grow as a team. Since collaboration is a central value of the Amp Lab, the construction design is geared towards wide, open concept learning suites. Therefore, students have the room to develop and contribute together.

State-of-the-Art Learning Environment

The Lab features all kinds of collective spaces where students can work, study, and create with one another:

8.3.22 043
  • Indoor greenhouse
  • Media production lab
  • Wood/Fabrication shop
  • Music production studio
  • Collaborative halls
  • Conference rooms
  • Classrooms

Get a tour of the Amp Lab below in our Electric Works Construction Update!

(Amp Lab featured at 0:41)

We’re so excited to partner with FWCS on this venture as they invest in a brighter future for their students!


SCAN Duck Race – The Results Are In!

DSC 0091

Ducks up the River!

DSC 0029

We had lots of fun watching thousands of colorful ducks make a splash on the St. Mary’s River during the 34th annual Weigand Construction Duck Race to benefit SCAN this year! We had up to 15,000 ducks starting from the Wells Street Bridge and floating towards the finish line. In the end, we were able to help fundraise over $220,000 for SCAN!

Watch the race right here!

For Children and their Families

DSC 0076

SCAN’s mission is to protect children from abuse and neglect by supporting families navigating through times of need. With the help of local businesses and people from all over our area, the money donated will go directly towards the services they give to the community. Their offering includes counseling, education, intervention programs, and prevention training. Here at Weigand, we are proud to be able to stand alongside SCAN; it’s an honor to partner with them in their charge to serve our community. With everyone’s support, their work is making it a safer, healthier place for children and their households to grow and flourish!

A giant THANK YOU to everyone who came out this year to watch the race, sponsor ducks, rally your support around SCAN, and advocate for a better future for kids in our community!


New Expansion – The Huntington County Jail

Leed Banner Indiana University Spruce Hall

“The group at Weigand have been fantastic to work with, I couldn’t imagine working with a different provider.”

Chris Newton (Huntington County Sheriff)

More Space to Serve

The Huntington County Jail is now equipped to better impact inmates, families, and the community at large through the completion of its new expansion and renovation! With Weigand operating as the general contractor on this project, the county sheriff commissioned development of the prison to fulfill the need for more space.

The 30,000 square foot expansion includes:

1.17.22 029
  • Enough rooms and bunks to host 233 people.
  • Sleeping and communal areas.
  • A tower for monitoring security with efficiency.
  • A vehicle port to improve transportation and processing.
  • A kitchen overhaul to account for the influx of staff and inmates.
  • Classrooms for rehabilitation programming.
  • Space for indoor and outdoor recreation.

With these additions to the jail, the sheriff’s department will be able to move forward with several different initiatives:

Huntington County Jail
  • Provide a safer environment for inmates and staff.
  • Implement GED programming.
  • Facilitate rehabilitation care.
  • Host Church gatherings.
  • Teach spiritual classes.

The objective is to create an atmosphere that fosters growth in learning, skills, and overall welfare. In this way, the jail can set up inmates for success in the real-world, making their first offense their last offense.

Everything in its Right Place

Because this project involved renovation and expansion, we helped with rearranging some of the equipment in the old and new spaces. As a result, it took some extra planning and teamwork with the Sheriff’s Department to make sure everything got placed in the right spots. By doing this, we were able to keep on track with our project schedule!

We were honored to work alongside the Sheriff’s Department and help give a new lease on life to their facility!