Weigand Construction Home Weigand Construction Home Icon
Industries
HealthcareEducationCommercialIndustrialRecreationalGovernment & MunicipalAll Projects
Why Weigand
Weigand DifferenceDelivery MethodsBIMSustainability + LEEDLeadership
Locations
Fort WayneSouth Bend
Careers
Full-TimeStudents
Talk to Us!
KEY STATS

Location:
Fort Wayne, IN

Type:
Expansion and Renovation

SQ FT:
180000

Delivery Methods:
CMc / CMAR

Carroll High School | Addition and Renovation


 

Planned to meet future needs with an ever-expanding student population, additions and renovations to Carroll High School’s existing campus are bringing greater quality of life to the everyday learning experiences for Chargers and educators alike. Designed by Barton Coe Vilamaa and built by Weigand, the project features new construction in the east, north, and south sections of campus.

 

East Classroom Expansion

 

A diverse set of classroom buildouts are now available including:

 

  • 2 Applied Skills Rooms
  • Science and Digital Design Rooms
  • 8 General Education Rooms
  • Credit Recovery Room
 

This expansion incorporates classrooms and spaces that support dynamic teaching environments for students as they pursue their academic goals, bringing 27 supplementary rooms in total across the entire project. It also features a bus loop for ease of access into the building.

 

North Corridor

 

Developments in the northern section feature:

 

  • A connecting hallway joining the west and east academic areas.
  • An upgraded Weight Room with a 50% capacity increase and space for up to 144 student athletes at one time.
  • An additional General Education Classroom.
 

Southern Access Point

 

A new student entrance now sits on the south side of the campus giving high schoolers a direct path to reach the Media Center. The 9,000 square-foot space has a library with spacious open seating, a café, 5 small study areas, and two conference rooms. The cafeteria is 30% larger with 4,000 square-feet of extra room, providing students with a sprawling area full of natural lighting where they gather, eat, and connect during the lunch period.

 

A Blueprint for the Future

 

This mix of new construction and redevelopment marks a significant next step securing the future for upcoming Chargers. The resources and room provided by the addition and expansion project provides support for another 500 students on campus. 

Connecting Corridor Media Center Cafe

PROJECT HIGHLIGHTS


0
Square Feet of Building Additions
0
Square Feet of Building Renovations
0
New Classrooms and Support Spaces
0
Person Capacity Weight Room
0
Square Feet Added to Cafeteria
0
Square Foot Media Center
Classroom III
South Student Entrance
Cleve Million
Principal, Carroll High School
South Student Entrance
“ Our theme this year is Blueprints for the Future: Equipping, Empowering, and Elevating our Students to the Next Level. This project is the perfect example of that vision in action.
See Our Featured Projects

Portfolio

  • Fort Wayne
  • Healthcare
  • Education
  • Commercial
  • Industrial
  • Recreational
  • Government & Municipal

Weigand

  • Leadership
  • Careers
  • News
  • Newsletter Sign-up
  • Philanthropy

Locations

  • Fort Wayne
  • South Bend

More

  • Procore Login
  • Contact
Weigand Construction Logo
7808 Honeywell Drive Fort Wayne, IN 46825
260.490.7449
  • Weigand Construction Facebook Page
  • Weigand Construction X Page
  • Weigand Construction Facebook Page
  • Weigand Construction Youtube Channel

© 2025 Weigand Construction

|
  • Legal
  • Privacy Policy
  • Terms of Use
  • Accessibility Policy
  • Cookie Settings